Candidate-1428

Candidate-1428
60000 (in NPR - Nepalese Rupee)

Candidate-1428

Scaffolder

    Seeking a scaffolder position that will allow the use of good physical strength and comfort working at high elevation.

  • Date Of Birth:1975-12-01
  • Place Of Birth:Gorkha, Nepal
  • Nationality:Nepalese
  • Religion:Buddhism
  • Gender:Male
  • Marital Status:Married
  • Current Address:chitwan, Nepal
  • Class 8 from Shree Manigam Devi High School, Gorkha, Nepal with 49% in Percentage(out of 100).
  • English Speaking
  • English Writing
  • Arabic Language
  • Ability to work under pressure
  • Teamwork
  • Company:Sumjang Company
    Address:Ruslafan, Qatar
    Position:Scaffolder
    From:10th Apr, 2007
    End:14th Oct, 2009
    Role:
    1. Erecting scaffolds in accordance with local, state, and federal. Erectors also must abide by all manufacturer recommendations and be capable of erecting scaffolds under the guidance of a competent person.
    2. Inspecting all scaffold components prior to assembly to insure that components used are of similar material and in good repair before becoming a part of the completed scaffold. This includes (but is not limited to): mudsills, screw jacks, frames, braces, planks, access ladders, brackets, etc.
    3. Maintaining fall protection requirements while erecting / dismantling scaffolds.
    4. Providing a scaffold to the user that is free from recognizable and preventable hazards (i.e. fall protection systems in place, falling object prevention in place, appropriate access / egress to and from the scaffold, appropriate anchorage and stability of the structure, appropriate walking / working surfaces, maintaining appropriate clearances from electrical hazards, etc.)
    5. Prior to occupation scaffold erectors must notify the competent person that the scaffold has been erected and is ready to be inspected.
  • Company:National Inspection & Technical Testing Co. Ltd
    Address:Dammam, Saudi Arabia
    Position:Scaffolder
    From:10th Apr, 2012
    End:5th May, 2016
    Role:
    1. Erecting scaffolds in accordance with local, state, and federal. Erectors also must abide by all manufacturer recommendations and be capable of erecting scaffolds under the guidance of a competent person.
    2. Inspecting all scaffold components prior to assembly to insure that components used are of similar material and in good repair before becoming a part of the completed scaffold. This includes (but is not limited to): mudsills, screw jacks, frames, braces, planks, access ladders, brackets, etc.
    3. Maintaining fall protection requirements while erecting / dismantling scaffolds.
    4. Providing a scaffold to the user that is free from recognizable and preventable hazards (i.e. fall protection systems in place, falling object prevention in place, appropriate access / egress to and from the scaffold, appropriate anchorage and stability of the structure, appropriate walking / working surfaces, maintaining appropriate clearances from electrical hazards, etc.)
    5. Prior to occupation scaffold erectors must notify the competent person that the scaffold has been erected and is ready to be inspected.

    List in empty

    List in empty

  • Height: 5 feet 5 inches (1.65m)
  • Weight: 65
  • Blood group:
  • Medical history:

    Normal